双组份打胶机的安装
Installation of two-component glue applicator
1、双组份打胶机设备应安装在干燥、无粉尘、无腐蚀性气体的坏境中(该要求与其他设备一致,当然如果条件达不到少争取无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高)。
1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for no corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
2、室内温度控制在10~40度的室内坚硬地面上,地面应水平度要好。(小编这里说的地面水平度要好不一定要非常的平整才行,我们的设备在设计之初已经考虑到了地面复杂性的因素所以对地面平整度是有相当大的忍让度的,只要不是幅度提别的大一般都可以正常工作。)
2. The indoor temperature shall be controlled on the indoor hard ground of 10 ~ 40 degrees, and the ground shall be better leveled. (the ground levelness mentioned here must be very flat. At the beginning of the design, our equipment has taken into account the complexity of the ground, so we have a considerable tolerance for the ground levelness. As long as the range is not increased, it can generally work normally.)
3、双组份打胶机安装之前,应先检查是否有因运输、搬动造成的变形、损坏和紧固件松动情况,之前就曾经有客户在移动打胶机的过程中把设备的智能控制系统的一个零部件碰掉了而导致设备无法正常运行,我们的工作人员到现场后才排查出的原因。
3. Before installing the two-component glue applicator, we should first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the glue applicator, which led to the failure of the equipment to operate normally. Our staff found out the reason after arriving at the site.
4、我们可以根据地面平整度的实际情况来通过调整设备的可升降地脚螺栓来调整设备的水平度直到设备水平而稳固。然后按图接线并可靠接地,把气源接入机器所配带的气源接口,确保无漏气现象。
4. Firstly, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is horizontal and stable. Then connect the wiring according to the diagram and reliably ground, and connect the air source to the air source interface equipped with the machine to ensure no air leakage.
5、向油槽中加注液压油指定位置,46#液压油(约为50升左右)。
5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
6、接通电源并打开查看设备是否能够正常运行。
6. Turn on the power and turn it on to see if the device can operate normally.
本文的精彩内容由济南双组份打胶机提供知识提供,本网站还有很多的精彩内容,更多的内容您可以点击进入:http://www.jntiannuo.com我们有专门的客服为您解答问题
The wonderful content of this article is provided by Jinan two-component gluing machine. There are many wonderful contents on this website. You can click to enter more contents: http://www.jntiannuo.com We have special customer service to answer your questions