中空玻璃打胶机在操作时要注意什么?

浏览:0
1、停电时马上到机器后面交换正在使用的排胶阀气管后,手动按动白胶电磁阀使气泵上下运动排胶到全白胶时停止。气管接回原处,结束。
1, when the power immediately to the machine behind the exchange is used after discharging valve pipe, manual press glue electromagnetic valve to make the pump up and down movement to stop discharging glue. Return the trachea to its original place and end.
2、生产时需要把玻璃里面一张标签撕掉或贴到玻璃的下方,防止光电感应开关感应到误动作损坏胶头。在自动状态时注意不要用手或其他异物遮挡光电开关,有问题时及时按下急停开关或关闭电源。
2, the production need to put a glass inside the label affixed to the bottom of the glass or the photoelectric switch to prevent misoperation damaged plastic head induction. In the state of automatic attention do not use hand or other foreign bodies from the photoelectric switch, there are problems in time when pressing the emergency stop or turn off the power switch.
3、下班时需要清理胶头,关闭连线,把旋转开关旋转到清洗和手动状态,按下排胶启动键,再按排胶阀键,这时胶头出胶,打开黑胶减压阀发排压,降下压力后关闭拧紧,待胶头出胶全是白胶后按下排胶阀键,间隔5秒左右再次按下排胶阀键降白胶压力,待压力降到1以下关闭排胶阀。 !!!《双系统》注意:泄黑胶压力时必须把两组黑胶压力都泄完。
Need to clean the rubber head 3, work, first close the connection, the rotary switch is rotated to the manual cleaning and discharging state, press the start button, then press button when discharging valve, rubber head glue, open the black glue valve pressure drop under pressure after publishing, close to tighten, head is full of glue glue according to the lower glue glue valve key, the interval of about 5 seconds Press the rubber drain button again to reduce the pressure of the white glue and close the rubber drain valve when the pressure drops below 1.!!! Attention to "double system": when the black rubber pressure is released, two groups of black rubber pressure must be exhausted.
济南双组份打胶机
4、每条边的打胶情况可通过工艺里面的向上调整,上部调整,向下调整,底部调整来适当调整,每次调整需保存。
4, each side of the glue can be through the process inside the upward and downward adjustment, the bottom of the upper adjusting, adjustment to adjust, adjust each need to save.
5、中途需要更换玻璃厚度或绿条厚度时,待生产上次规格玻璃后一张玻璃时关闭连线,打完后一张玻璃进入输出端停下时转到手动状态,进入玻璃厚度界面设置需要的玻璃厚度或绿条厚度,设置完成以后连线自动生产。
5, midway need to replace the glass thickness or green strip thickness, close the connection to the last production specifications of glass last piece of glass, finished the last piece of glass to the manual state into the output end stop when the thickness of the glass into the interface settings need glass thickness or green strip thickness, set up after the completion of the automatic production line.
6、需要排胶时先关闭连线,待打胶的玻璃打完并移动到输出端以后按下排胶启动按钮,再按排胶阀。这时需要继续生产就需要把设备旋转到手动状态,按下连线按钮,再次转到自动状态,按下自动运行按钮继续生产。
6, you need to close the connection when discharging, after the glue glass finish and moves to the output end of discharging press the start button, then press the discharging valve. The need to continue production requires the equipment rotation to the manual state, press the connect button again to automatic state, press the automatic operation button to continue production.
7、打胶时若胶头残余胶较多时需及时清理,清理时注意防止辅助传送伤手,玻璃平整度不好时需要用手辅助玻璃,必须使检测器在两片玻璃之间移动。
7, if the adhesive glue head residual glue more the need for timely cleaning, cleaning Caution! Auxiliary transmission to prevent hand injury, glass flatness is not good when the auxiliary glass by hand, must make the detector moving between two pieces of glass.
有了双组份打胶机上面的小总结,希望对广大客户有所帮助,如果有什么不理解的或者寻求帮助的请点击我们的网站:http://www.jntiannuo.com或者来电咨询,我们会尽全力为您解决
A two-component small sum atx-ii above, hope to help customers, if what you do not understand or seek help please click on our official website: http://www.jntiannuo.com or contact us, we will do our best for you to solve